Y2 90-6 1.1kw Three Phase AC Electric Motor

 


Y2 Motor Features

Y2 sequence electrical motor are totally enclosed and enthusiast cooled(TEFC),a few-period squire cage induction motor, designed variety of Y sequence electries motors with new techbique. The mounting dimension is conformend with the related requirements of IEC standards.

Y2 sequence electric powered motor are with lovely determine,compact structure,minimal noise,large efficiency,big commencing torque,effortless procedure,and so on.The motors are adopted with insulation course F and pretrction classip54.These motors are up to the global standard of nineteen nineties.

Y2 collection electric powered motors are broadly used in a lot of locations,such as HVAC,drilling devices,pumps,fans,winches,air compressors,ground cleaning machines,transport equipment,meals devices,agriculture machines aand equipments, etc

Notice:we can also produce CZPT motors according to clients’special  needs,this sort of as 50hz,60hz,380v,400v,415, 460v,575v,660v: IP55
Insulation course :F.H.

one.Thorough Item Description

1.CE certificate 
2.Copper wire 
3.Cold-rolled silicon steel sheet

2.Specifications

1. Silicon metal DR510, 800, 600, 360 regular use stamping of lamination stator and rotor die-casting
2. a hundred% copper winding and inserting stator (guide and semi-automatically)
3. Stator Vacuum impregnation and drying
four. CNC machining motor shaft, body, end shields, and so on
five. Skilled workman inspecting spare parts each processing
six. CZPT motor assembly solution line
7. CZPT motor will one hundred% test before painting. 
8. CZPT motor spray-paint on motor painting solution line
nine. CZPT motor will a hundred% verify again just before packing. 
An electric motor from materials to end motor, should move fifteen time verify, and 100% screening, output electricity,voltage,
electric existing, non-load, 50% load, seventy five% load, a hundred% load and check the nameplate, packing.
Last but not least transport to our consumer.

3.CZPT Data

Sort Output Existing (A) Pace Eff. Electricity
Factor
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-2 .18 .25 .53 .50 2720 sixty five .8 five.five 2.two 2.2
Y2E1-632-two .25 .34 .69 .66 2720 68 .eighty one six.five 2.two 2.2
Y2E1-711-2 .37 .five .ninety nine .ninety four 2740 70 .eighty one seven 2.two two.two
Y2E1-712-two .55 .75 1.40 1.33 2740 73 .82 seven two.2 two.3
Y2E1-801-2 .seventy five one one.83 1.seventy four 2830 seventy five .eighty three 7.five 2.two 2.3
Y2E1-802-2 1.1 one.five two.fifty eight two.45 2830 77 .eighty four seven.9 2.2 two.3
Y2E1-90S-two 1.5 two three.43 3.26 2840 79 .eighty four seven.5 two.two 2.3
Y2E1-90L-2 two.2 three 4.85 4.sixty one 2840 eighty one .eighty five seven.5 two.two two.three
Y2E1-100L-2 three four six.31 6.00 2870 83 .87 7.five two.2 two.three
Y2E1-112M-two four 5.5 eight.twelve 7.seventy two 2880 eighty five .88 7.five two.2 two.3
Y2E1-132S1-2 five.5 seven.five 11.04 ten.forty nine 2900 86 .88 7.5 2.2 2.3
Y2E1-132S2-two seven.five 10 fourteen.88 14.fourteen 2900 87 .88 seven.five two 2.3
Y2E1-160M1-2 11 15 21.34 twenty.27 2940 88 .89 7.5 2 2.3
Y2E1-160M2-two fifteen 20 28.77 27.33 2940 89 .89 seven.five two 2.3
Y2E1-160L-2 eighteen.five twenty five 34.70 32.97 2940 90 .nine 7.five 2 two.three
Y2E1-180M-two 22 30 forty one.27 39.20 2940 90 .9 7.five two two.2
Y2E1-200L1-two thirty 40 55.53 52.seventy five 2950 ninety one.two .nine 7.five two 2.two
Y2E1-200L2-two 37 fifty sixty seven.89 sixty four.fifty 2950 ninety two .9 seven.5 2 two.2
Y2E1-225M-2 45 sixty eighty two.thirteen seventy eight.02 2970 ninety two.3 .nine seven.five two 2.two
Y2E1-250M-two 55 seventy five ninety nine.eighty four 94.eighty five 2970 ninety two.five .9 seven.5 two 2.2
Y2E1-280S-2 seventy five one hundred 134.ninety eight 128.23 2970 ninety three .9 7.5 2 two.two
Y2E1-280M-2 ninety one hundred twenty five 161.sixty three 153.fifty five 2980 ninety three.eight .nine seven.five 2 2.2
Y2E1-315S-2 one hundred ten 150 194.35 184.sixty three 2980 94 .ninety one seven.one one.eight two.2
Y2E1-315M-2 132 a hundred and eighty 232.97 221.32 2980 94.5 .91 seven.1 1.eight 2.two
Y2E1-315L1-two one hundred sixty 220 278.73 264.79 2980 ninety four.six .92 seven.1 one.8 2.two
Y2E1-315L2-two two hundred 270 346.fifty eight 329.twenty five 2980 ninety four.eight .ninety two seven.1 one.8 two.2
Y2E1-355M-two 250 340 431.87 410.27 2980 ninety five.3 .ninety two 7.one one.six two.2
Y2E1-355L-two 315 420 544.15 516.94 2980 95.six .ninety two seven.1 1.six 2.two
Y2E1-631-4 .twelve .16 .44 .42 1310 fifty seven .72 five.two two.4 2.2
Y2E1-632-four .eighteen .twenty five .62 .59 1310 sixty .73 five.two 2.4 two.2
Y2E1-711-4 .twenty five .34 .79 .75 1330 65 .74 5.2 2.4 2.two
Y2E1-712-four .37 .5 1.13 1.08 1330 sixty seven .74 five.2 two.4 two.two
Y2E1-801-4 .55 .75 one.fifty five one.forty seven 1440 71 .76 five.seven 2.four two.3
Y2E1-802-4 .seventy five 1 two.03 1.ninety three 1440 seventy three .77 6 2.three 2.3
Y2E1-90S-4 1.1 1.5 two.89 two.seventy five 1400 75 .seventy seven 6 two.three two.three
Y2E1-90L-four one.5 two 3.70 three.51 1400 78 .seventy nine six two.three 2.three
Y2E1-100L1-four two.2 3 five.16 4.ninety 1430 80 .81 7 2.3 two.three
Y2E1-100L2-4 3 four six.seventy eight 6.forty four 1430 82 .82 seven 2.three two.3
Y2E1-112M-4 four 5.5 eight.82 eight.38 1435 84 .eighty two 7 two.three two.3
Y2E1-132S-four 5.five seven.five 11.eighty four eleven.25 1440 eighty five .83 seven 2.three 2.3
Y2E1-132M-4 7.five ten fifteen.59 fourteen.81 1440 87 .eighty four 7 two.three 2.three
Y2E1-160M-4 11 15 22.sixty one 21.forty eight 1470 88 .eighty four seven 2.2 2.three
Y2E1-160L-four 15 twenty thirty.thirteen 28.sixty two 1470 89 .85 7 two.two two.three
Y2-180M-4 18.5 twenty five 36.eleven 34.31 1460 90.five .86 seven 2.two two.three
Y2-180L-4 22 thirty forty two.71 forty.58 1460 91 .86 seven.5 two.2 2.three
Y2-200L-four 30 40 fifty seven.sixty one 54.73 1470 ninety two .86 seven.five 2.2 two.three
Y2-225S-4 37 50 sixty nine.85 sixty six.36 1470 92.five .87 seven.5 two.two 2.three
Y2-225M-4 45 60 eighty four.sixty eight eighty.45 1470 ninety two.eight .87 seven.five 2.two two.three
Y2-250M-four fifty five seventy five 103.28 98.12 1470 93 .87 seven.two two.two two.3
Y2-280S-four 75 100 139.sixty four 132.65 1480 ninety three.8 .87 7.two two.two 2.3
Y2-280M-4 ninety 125 166.85 158.51 1480 ninety four.two .87 7.2 two.two two.three
Y2-315S-four a hundred and ten a hundred and fifty two hundred.ninety seven 190.ninety two 1480 ninety four.five .88 7.2 two.2 2.3
Y2-315M-four 132 a hundred and eighty 240.forty 228.38 1485 94.8 .88 7.two two.one 2.3
Y2-315L1-4 one hundred sixty 220 291.09 276.54 1485 94.nine .88 six.nine two.one two.3
Y2-315L2-four 200 270 359.40 341.43 1485 ninety five .89 six.9 two.one two.3
Y2-355M-four 250 340 442.eighty five 420.71 1490 95.3 .9 six.nine 2.1 2.2
Y2-355L-4 315 420 556.24 528.forty three 1485 ninety five.6 .nine six.9 2.one 2.two
Y2E1-711-six .18 .twenty five .74 .70 850 56 .sixty six four 1.9 two
Y2E1-712-six .twenty five .34 .95 .90 850 59 .sixty eight four one.nine 2
Y2E1-801-six .37 .five one.30 1.23 890 sixty two .7 4.7 one.9 two
Y2E1-802-6 .55 .seventy five 1.seventy nine one.70 890 65 .seventy two 4.7 one.9 two
Y2E1-90S-six .75 1 two.18 two.07 910 seventy two.7 .seventy two 5.5 two two.one
Y2E1-90L-6 1.1 one.5 three.01 2.86 910 76 .73 5.5 two 2.one
Y2E1-100L-6 1.5 2 3.85 3.65 940 79 .75 5.five 2 2.one
Y2E1-112M-six 2.2 3 five.43 5.16 940 81 .76 6.five two 2.one
Y2E1-132S-6 three four seven.31 six.95 960 eighty two .76 six.five two.1 two.1
Y2E1-132M1-six four five.five nine.52 nine.04 960 eighty four .76 six.five two.one two.one
Y2E1-132M2-six five.5 7.5 12.62 eleven.ninety nine 960 86 .seventy seven 6.five two.1 2.one
Y2E1-160M-six 7.five ten 16.ninety one 16.07 970 87.five .77 six.5 two two.1
Y2E1-160L-6 11 fifteen 23.18 22.02 970 89 .81 six.5 two two.one
Y2E1-180L-six fifteen 20 31.26 29.70 980 ninety .81 6.five 2.one two
Y2E1-200L1-six 18.five twenty five 37.sixty three 35.seventy five 980 90 .83 six.5 two.1 2
Y2E1-200L2-six 22 30 forty three.25 forty one.09 980 92 .eighty four 7 two.1 two
Y2E1-225M-six thirty forty 57.thirty 54.forty three 980 92.five .86 7 2.1 two
Y2E1-250M-6 37 fifty 70.forty four sixty six.ninety two 980 92.eight .86 7 two 2
Y2E1-280S-6 45 60 eighty five.03 80.seventy eight 990 ninety three.5 .86 7 2 2
Y2E1-280M-6 fifty five seventy five 103.59 98.forty one 990 ninety three.8 .86 seven 2 two
Y2E1-315S-six 75 a hundred 139.34 132.37 990 ninety four .87 6.7 two 2
Y2E1-315M-6 90 125 168.79 a hundred and sixty.35 990 ninety four.two .86 six.7 2 two
Y2E1-315L1-6 one hundred ten one hundred fifty two hundred.ninety seven a hundred ninety.92 990 94.5 .88 six.seven 2 two
Y2E1-315L2-six 132 180 240.66 228.sixty two 990 ninety four.7 .88 six.seven one.9 two
Y2E1-355M1-6 one hundred sixty 220 292.01 277.forty one 990 94.six .88 six.seven 1.9 2
Y2E1-355M2-6 two hundred 270 363.86 345.67 990 94.9 .88 six.seven one.nine two.1

Why us? 

one.Minimal MOQ: It can fulfill your advertising enterprise extremely well.
  
two.Great Service : We handle clientele as pals,providing 24 hrs a days 7days a week services assistance.

 three.Very good Quality :We have rigorous top quality control method.Good popularity in the marketplace.
 
4.Quickly & Cheap Shipping: We have large price reduction from CZPTer.

FAQ

Q: Do you offer OEM services?

A: Yes 

Q: What is your payment phrase?

A: 30% T/T in advance, 70% equilibrium when obtaining B/L duplicate.  Or irrevocable L/C.

Q: What is your lead time?

A: About 30 times after acquiring deposit or first L/C.

 

 

Y2 90-6 1.1kw Three Phase AC Electric Motor